RJ Energy practical guide · Scotland

SAP calculations & Section 6 explained

Understand the assessment process, the notional dwelling and the design decisions that help your new home meet Scotland’s energy performance requirements.

Understand the notional dwelling
Red brick homes in a residential development
From drawings and specification to design-stage and as-built assessments.

Start with the right requirements

What are SAP calculations?

SAP stands for Standard Assessment Procedure: the government’s method for assessing a dwelling’s energy performance. It uses consistent assumptions about occupancy and use, allowing homes to be compared. The results support energy ratings and Building Standards assessments; they are not a forecast of an individual household’s bills.

For new homes in Scotland, SAP calculations support the energy assessment under Section 6 of the Domestic Technical Handbook. The model brings together the dwelling’s fabric, heating, hot water, ventilation and renewable generation.

This guide focuses on newly built homes in Scotland. Extensions, conversions and work to existing homes can follow different assessment routes. The building warrant application date determines the applicable standards and guidance. We confirm the applicable requirements and methodology before modelling your project.

From drawings to completion

How the assessment is undertaken

1. Build the energy model

The assessor measures the dwelling from drawings and records its construction, insulation, openings, orientation, junctions, airtightness, ventilation, heating, hot water, lighting and any renewable generation.

2. Review design options

The proposed specification is modelled and checked. If a target is missed, we can compare realistic alternatives before construction work begins.

3. Keep the model up to date

Tell the assessor about changes to glazing, insulation, services or construction details. A substitution can change the result, even when the replacement appears similar. Keep the calculations aligned with the warrant design and agree changes with your design team and verifier.

4. Confirm what was built

The as-built assessment uses the installed specification and supporting evidence. You will need to provide final product details, an air tightness test certificate and relevant commissioning evidence so the assessor can prepare the final calculations and completion documentation.

The benchmark behind the targets

What is the notional dwelling?

The notional dwelling is a theoretical reference home with the same size, shape and living area fraction as your proposed dwelling. Scottish guidance assigns the targeted fabric and services specification, linked to the main heating solution. It establishes the Target Delivered Energy Rate (TDER).

Your home’s calculated Dwelling Delivered Energy Rating (DDER) must be no greater than that target. Both are expressed in kWh/m² per year. A lower DDER means less calculated delivered energy per square metre under the assessment assumptions.

CheckWhat it means for your design
Standard 6.1 · Energy demandCompare DDER with TDER using the Scottish notional dwelling rules. Check any additional requirements applicable to the heating arrangement.
Standard 6.2 · Building fabricDemonstrate fabric compliance through the applicable elemental or space heating demand route, including relevant limiting standards.
Building services and heatingMeet the relevant services requirements and Standard 6.11, as well as the SAP target.

Read the Scottish Domestic Technical Handbook →

The reports for your verifier

Which reports are needed in Scotland?

For a home in Scotland, the assessor prepares the appropriate Scottish SAP compliance outputs and supporting evidence for the building warrant and completion process.

Design stage reports

Prepared before construction, these set out the proposed specification and performance. The verifier may request construction details, U-value calculations and services information alongside the SAP assessment.

As built reports

Prepared at completion, these reflect the actual construction and any changes from the design assessment. The final SAP outputs and Energy Performance Certificate form part of the energy documentation needed for completion.

The SAP assessment is one part of the evidence package. Keep the calculations aligned with the approved drawings and agree any changes with your design team and verifier.

Practical steps towards compliance

How to help your project pass

  1. Model early. Agree the compliance strategy while changes to the design are still straightforward.
  2. Coordinate the specification. Confirm insulation build-ups, whole-window performance and the actual heating and ventilation products.
  3. Detail the junctions. Keep insulation continuous and obtain appropriate, evidenced psi values for the junction details used in your project.
  4. Make airtightness achievable. Identify the air barrier, explain the details to site teams and coordinate ventilation to suit the approach.
  5. Protect the design on site. Record substitutions, gather supporting evidence and review any changes before they are implemented on site.

A good SAP result does not replace the other requirements. Renewable generation can improve the calculated energy performance, but the relevant fabric and services standards also need to be met.

Heating choices and common questions

Heating choices and the New Build Heat Standard

Standard 6.11 introduces the New Build Heat Standard. Fossil fuel gas and oil boilers cannot be used as the main heating system in new build homes covered by these rules. Heat pumps and heat networks are potential options, subject to the project’s design.

Amendments effective from January 2025 permit bioenergy and peat heating, and any type of secondary heating. The correct treatment depends on the warrant date, the system’s role and the applicable provisions.

Read the Scottish Government’s New Build Heat Standard guidance →

What if the first calculation fails?

A design failure identifies where further work is needed. RJ Energy can help compare specification changes and explain their effect on the results. The aim is an achievable, coordinated design that also performs as intended when built.

There is no universal “pass” SAP score. An EPC band or SAP rating alone does not establish Section 6 compliance.

Guidance and regulation updates

Reviewed 6 October 2026. The April 2026 Domestic Technical Handbook applies to building warrants submitted on or after 6 April 2026, with earlier editions relevant to earlier applications. Future energy standards proposals are separate from the requirements applicable to your project.

Further reading: Scottish Domestic Technical Handbook · Scottish Building Standards guidance and earlier editions · BRE SAP specifications

Building in England? Read our SAP calculations and BREL reports guide →

Need help with your SAP assessment?

Send your drawings and project details. We’ll confirm the right assessment route and help you work towards a coordinated specification.

Request a project quote