SAP calculations & BREL reports explained

Understand the assessment process, the notional dwelling and the design decisions that help your new home meet its energy performance targets.

Understand the notional dwelling
Red brick homes in a residential development
From drawings and specification to design-stage and as-built assessments.

Start with the right requirements

What are SAP calculations?

SAP stands for Standard Assessment Procedure: the government’s method for assessing a dwelling’s energy performance. It uses consistent assumptions about occupancy and use, allowing homes to be compared. The results support energy ratings and Building Regulations assessments; they are not a forecast of an individual household’s bills. An EPC is generated from the SAP calculations once construction is completed, the EPC rating is based on the the modelled energy costs and energy use of the dwelling.   

This guide focuses on newly built homes in England. Extensions, conversions and work to existing homes can follow different assessment routes. Scotland and Wales have their own requirements. We confirm the applicable regulations and methodology before modelling your project.

From drawings to completion

How the assessment is undertaken

1. Build the energy model

The assessor measures the dwelling from drawings and records its construction, insulation, openings, orientation, junctions, airtightness, ventilation, heating, hot water, lighting and any renewable generation in approved software.

2. Review design options

The proposed specification is modelled and checked. If a target is missed, we can compare realistic alternatives before construction work begins.

3. Keep the model up to date

Tell the assessor about changes to glazing, insulation, services or construction details. A substitution can change the result, even when the replacement appears similar which can cause significant issues at the as-built stage if the dwelling is then failing to achieve the required targets.

4. Confirm what was built

The as-built assessment uses the installed specification and supporting evidence. You will need to provide specific photographic evidence that you have collected throughout the build, an air tightness test certificate, proof of the U-Values for the openings and commissioning certificates for heating, hot water, ventilation and renewables. 

The benchmark behind the targets

What is the notional dwelling?

The notional dwelling is a theoretical reference home with the same size and shape as your proposed dwelling, but with standardised fabric and building services. Its calculated performance establishes the project’s targets. The notional specification depends on the regulations that apply.

Your home can use a different combination of products and systems, provided it meets the applicable overall targets and other requirements. Achieving only the limiting U-value standards in building regulations does not demonstrate compliance, the targets below must also be met.

Check for new homes in EnglandWhat is compared?
Primary energyDwelling Primary Energy Rate (DPER) ≤ Target Primary Energy Rate (TPER)
Carbon emissionsDwelling Emission Rate (DER) ≤ Target Emission Rate (TER)
Fabric energy efficiencyDwelling Fabric Energy Efficiency (DFEE) ≤ Target Fabric Energy Efficiency (TFEE)

These are separate checks. A good result in one does not cancel a failure in another. Limiting fabric and services standards, testing and commissioning also matter. 

The report for building control

What is a BREL report?

BREL is the Building Regulations England Part L report produced by SAP software. It records the calculated targets, dwelling results and specification used to assess compliance.

Design stage BREL

Prepared before construction, this sets out the proposed specification and performance. A copy of this should be sent to Building Control to show your intended route to compliance.

As built BREL

Prepared at completion, this reflects the actual construction and any changes from the design assessment. The assessor and developer have respective sign-off responsibilities. Building Control will require a copy of this in order to release your completion certificate. 

The evidence required upon completion of the build includes relevant photographic evidence and documents. The BREL report, EPC and photographic evidence are all required by Building Control. It is a requirement to ensure the building occupant also has a copy.

Practical steps towards compliance

How to help your project pass

  1. Model early. Agree the compliance strategy while changes to the design are still straightforward.
  2. Coordinate the specification. Confirm insulation build-ups, whole-window performance and the actual heating and ventilation products.
  3. Detail the junctions. Keep insulation continuous and obtain appropriate, evidenced PSI values. A project will not pass the targets with default thermal bridging values being used. It is important to design junctions to either match an existing available set or to have your junctions specifically modelled. Companies such as H+H, Fibolite and Knauf all have PSI value packs to use when utilising their junction details). 
  4. Make airtightness achievable. Identify the air barrier, explain the details to site teams and coordinate ventilation to suit the approach.
  5. Check the failed metric first. As a practical approach, review the fabric first if the DFEE fails. This is often commonly the hardest target to achieve and is heavily affected by the impact of thermal bridging. Fixing issues with this metric will result in improvements in the others which can often lead to full compliance. 
  6. Protect the design on site. Record substitutions, gather photographic evidence before it is covered up and review any changes before they are implemented on site.

Solar PV cannot repair a failed fabric energy efficiency result. Renewable generation can improve other energy metrics, but fabric performance has its own target. 

Common questions

What if the first calculation fails?

A design failure identifies where further work is needed. RJ Energy can help compare specification changes and explain their effect on the results. The aim is an achievable, coordinated design that also performs as intended when built.

There is no universal “pass” SAP score. An EPC band or SAP rating alone does not establish Part L compliance. 